Why Virginia

Virginia and the Infrastructure Opportunity

Virginia's data center industry is the largest in the world. That is not a talking point — it is a fact reflected in county budgets, investment figures, and workforce numbers across the Commonwealth. The investment has produced measurable benefits for decades, and the state is now at a decision point: whether to extend that success into new regions, or to cut it off or slow it through policy uncertainty that pushes investment to other states.

The conversation about data centers in Virginia today is more complicated than it used to be. Concerns about grid reliability, electricity rates, and land use are real and deserve factual answers. Built Here exists to empower Virginians with the facts so they can make smart decisions about future growth.

The Benefits Are Real

  1. Tax revenue for schools and public services. Loudoun County collected $1.3 billion in data center property taxes in 2024, funding schools, first responders, and public infrastructure. Without that revenue, the county's property tax rate would likely exceed $1.00 per $100 of assessed value — compared to the current rate of $0.805, which has fallen 30% over the past decade (NVTC/Mangum 6th Biennial Report, March 2026).
  2. Infrastructure investment funded by developers, not taxpayers. Data center developers fund significant grid and infrastructure upgrades as a condition of development. Virginia's own non-partisan study commission found that data centers are currently paying their full cost of service — meaning the infrastructure costs they drive are borne by the industry, not passed on to residential ratepayers (JLARC, Data Centers in Virginia, December 2024).
  3. Construction employment and long-term operations jobs. Virginia's data center industry supports 112,880 total jobs statewide — direct operations, construction, and supply chain (NVTC/Mangum 6th Biennial Report, March 2026). The industry has driven $157 billion in capital investment since 2020, generating sustained demand for skilled tradespeople across the construction cycle.
  4. Long-term economic stability and supply chain activity. Virginia's data center sector generates $39.97 billion in annual economic output — a figure that flows through the full range of supply chain and service sector businesses that support facility operations (NVTC/Mangum 6th Biennial Report, March 2026).

How Virginia Oversees Data Centers

Virginia has established legal and regulatory frameworks on both the state and local levels that govern data center impacts. Below are several key examples — this is not a comprehensive list, and these requirements do not include numerous regional mandates, like those of PJM — the regional organization that coordinates generation and transmission operations for Virginia and several other states — and federal laws and regulations, like the U.S. EPA’s stringent restrictions on the use of emergency generators through enforcement of the Clean Air Act.

  • The Virginia State Corporation Commission sets the rules for how utilities price electricity and regularly reviews utility rates to ensure they are reasonable. SCC reviews consider whether a utility is over- or under-collecting costs according to customer class and whether any changes are needed to address any cost allocation issues. In making its determinations, SCC examines cost of service studies and other information presented by the utility and sometimes performs its own independent analysis. (JLARC, December 2024).
  • Permits are required by Virginia’s Department of Environmental Quality (DEQ) for data center backup generators. DEQ permits limit during what hours generators can run, how long they can run, and the maximum annual emissions each permitted site is allowed. Data centers cannot, and do not, run their generators indefinitely — even in an emergency. All generators permitted for data centers by DEQ after July 1, 2026, must be Tier IV — the highest EPA rated backup generator — or Tier IV-equivalent. (DEQ Issued Air Permits for Data Centers, July 2026; DEQ Data Center Air Permits Guidelines)
  • DEQ regulates direct data center withdrawals from the Commonwealth’s water sources over a certain per-gallon threshold, including mandating withdrawal permits. In cases where a data center receives its water from local water utilities, DEQ still monitors and permits all utility withdrawals. Those permits specify withdrawal limits and set other requirements, such as a limit on withdrawals during droughts. (DEQ Water Withdrawal)
  • Local governments, not data centers, determine what types of development are permitted on what parcels of land through the zoning and planning processes, which must include opportunities for public input according to Virginia Code. (Code of Virginia, Title 15.2, Chapter 22 Article 7)
  • All Virginia localities must perform sound, ground and surface water resources, agricultural resources, parks, registered historic sites, and forestland impact studies before approval of a data center’s local rezoning application, special exemption, or special use permit. (HB 153)
  • Data centers must annually report employment levels, capital investment, average annual wages, and other critical information to the Virginia Economic Development Partnership Authority to benefit from the Commonwealth’s Retail Sales and Use Tax exemption. (Code of Virginia, Title 58.1, Chapter 6)

Myth vs. Fact in Virginia

Myth: Data centers are pushing electricity bills up for Virginia families.

FACT: The main drivers of electricity rate increases in Virginia are general grid infrastructure investment and inflation — not data center energy demand. The Virginia State Corporation Commission's November 2025 biennial review recognized this directly: rather than allowing Dominion Energy's full requested rate increase of $822 million, the SCC approved a significantly lower increase of $565.7 million, while simultaneously creating a new rate class requiring the largest electricity users — including data centers — to pay a minimum of 85% of contracted distribution and transmission demand charges and 60% of generation demand charges. The SCC's explicit intent was to ensure that infrastructure costs driven by data centers are borne by data centers, not passed to residential customers (Virginia SCC, November 2025).

Myth: Data centers are using too much of Virginia's water.

FACT: A 2024 study by the Joint Legislative Audit and Review Commission (JLARC) found that 83% of Virginia data centers use the same amount of water or less than a large office building. Modern facilities increasingly use air cooling or closed-loop water systems that significantly reduce consumption. Water use is regulated through state permitting processes that include public review periods (JLARC, Data Centers in Virginia, December 2024).

Myth: Virginia has already given data centers too much — communities have no say in what gets built where.

FACT: Land use decisions in Virginia remain with local governments, not developers. Localities determine what types of development are permitted on specific parcels through zoning and approval processes that require public hearings and community input. Virginia's regulatory framework has grown more rigorous as the industry has grown, and the fiscal track record in communities like Loudoun County shows what well-governed, responsible development actually delivers.

Myth: We keep hearing big economic claims — but are they real?

FACT: Yes, and they are independently verified. In Loudoun County, Mangum Economics found that data centers generate $26 in local tax revenue for every $1 of public services they require — a fiscal return ratio far above what any other industry type produces. That figure is based on economic data compiled by an independent economist for the Data Center Coalition and is consistent with ratios documented across multiple editions of the same research. At the statewide level, Virginia's data center sector generates $39.97 billion in annual economic output, supporting 112,880 jobs and contributing over $1.5 billion in annual state tax revenue (NVTC/Mangum 6th Biennial Report, March 2026).

Myth: Tax incentives for data centers aren't worth the cost to taxpayers.

FACT: Virginia's data center incentive framework produces net positive fiscal outcomes. The industry contributes over $1.5 billion in annual state tax revenue statewide, independently documented by Mangum Economics in the 2026 NVTC Biennial Report (NCTV Report, March 2026). Loudoun County's property tax rate has fallen 30% over the past decade — from $1.145 per $100 of assessed value in 2016 to $0.805 in 2025 — as data center revenue has grown. The county's own public FAQ notes that without data center revenue, the residential property tax rate would likely exceed $1.00. Incentives attract investment that generates more revenue than they forgo.

Myth: The jobs are temporary construction jobs — there's nothing left when the building is done.

FACT: Construction is temporary by nature — that is true of hospitals, factories, and schools, not just data centers. The durable benefit comes from two sources: operations jobs that continue for the life of the facility, and property tax revenue that funds local governments and school districts on an ongoing basis. In Virginia, the data center industry supports 112,880 total jobs statewide and generates $39.97 billion in annual economic output — figures that reflect the long-term, compounding nature of this investment, not a one-time construction boom (NVTC/Mangum 6th Biennial Report, March 2026).

Myth: It doesn't matter where this gets built — data lives in "the cloud" anyway.

FACT: The cloud is physical. Every email, medical record, and financial transaction lives on a server in a specific building in a specific place. Where that building is determines whose laws govern it and who can access it. When this infrastructure is built here — in Virginia, by Virginia workers — it stays under American law. That is not just good for Virginia's economy. It is good for the country.

Glossary

Data center

A building that houses computer servers, networking equipment, and the power and cooling systems that keep them running. Data centers are the physical infrastructure behind digital services — storing files, processing transactions, routing communications, and supporting the systems that hospitals, emergency services, banks, and businesses depend on every day.

Server

A computer designed to process and store data continuously, running the software that powers websites, applications, databases, and digital communications. Data centers house thousands to hundreds of thousands of servers depending on their size and purpose.

Closed-loop cooling system

A cooling system in which the same water circulates continuously through the facility rather than being drawn from and discharged back into local water supplies. After the initial fill, a closed-loop system requires minimal water to maintain — typically a few thousand gallons per year. Most modern data centers use closed-loop or air-cooled systems.

Direct job

A permanent position created and employed directly by the data center facility — engineers, technicians, operations staff, and security personnel who work on-site.

Indirect job

A job created in the surrounding economy as a result of a data center's presence — in supply chain businesses, local services, construction trades, and other sectors that support the facility and its workforce.

Load growth

An increase in total electricity demand on a utility's grid. Load growth can be driven by population growth, electrification of homes and vehicles, manufacturing expansion, and large-load customers like data centers. Research has found that when load growth is planned for, it can lower per-unit electricity costs by spreading fixed grid costs across more customers.

Ratepayer

A residential or business customer who pays for electricity, water, or other utility services. Ratepayer protection refers to regulatory frameworks that prevent the costs of large-load infrastructure from being passed to ordinary utility customers.

Incentive / tax exemption

A reduction in a specific category of taxes — typically sales tax on equipment and construction materials — offered by a state or local government to attract qualifying investment. Incentive programs require minimum investment levels and job creation thresholds; facilities still pay property taxes, income taxes, and other local taxes from the first day of operation.

Large-load customer

A utility customer that consumes electricity at a significantly higher volume than residential or small commercial customers. Data centers are classified as large-load customers in most states. Many states have specific rate structures that require large-load customers to pay their proportional share of any grid infrastructure upgrades they trigger. In Virginia, the SCC's GS-5 rate class applies to customers with peak demand of 25 megawatts or more, effective January 2027.